DRI-STEEM GTS Humidifier Installation, Operation, and Maintenance Manual Page 25
The drain line piped from the humidifier must be run to
an approved sanitary waste or suitable drain. Although the
GTS humidifier is equipped with integral water tempering, if
nonmetallic drain pipe or hose is used, DRI-STEEM recommends
it be rated for 212 °F (100 °C) minimum continuous operating
temperature.
Minimum drain pipe size is 1½" (DN40) inside diameter. Do not
reduce the size of the drain piping. If the length of the drain piping
exceeds 10' (3 m), increase the pipe size. If combining multiple
drain lines together, ensure proper common pipe sizing practices
are used.
Do not locate the humidifier directly above a floor drain — skim
and drain water dumped into the drain will cause flash steam.
This steam will rise and saturate electrical components, adversely
affecting component life and performance.
An open drain with a 1" (25 mm) air gap between the drain piping
and the drain is required. Locate air gap only in spaces with
adequate temperature and air movement to absorb flash steam;
otherwise, condensing on nearby surfaces may occur.
Drain piping after the water seal must be pitched a minimum of
1/8"/ft (1%) toward the drain. Governing codes may require more
pitch.
If the proximity of a drain requires the humidifier drain and skim
water to be lifted, use a water pump with capacity of at least
12 gallons per minute (gpm) or 45.4 litres per minute (L/m).
Contact DRI-STEEM to order a drain pump suitable for your
installation. A check valve is required on the discharge of the pump
(see Figure 25-1). Electrical power for the pump is independent
of the humidifier.
The GTS humidifier has an auxiliary 1½" (DN40) drain outlet
located below the subpanel. This drain outlet can be hard-
piped during installation to enable rapid tank draining before
maintenance. This outlet can also provide access for removing scale
from the tank bottom.
D r a i n p i p i n g
Inlet
drain
water
piping,
by installer
Figure 25-1:
Lifting drain water
DC-1117Note: Size water pump to handle a minimum of 12 gpm (45.4 L/m).
Check valve
Discharge
piping, by
installer
Water pump
Table 25-1:
Integral water tempering
specifications
Water type
Maximum
low rate
Maximum
temperature
U.S.
gpm
L/m °F °C
Hot water
inflow
6 22.7 212 100
Cold water
inflow*
6 22.7 70 21
Tempered
water outflow
12 45.4 140 60
Note:
* Cold water inflow pressure must be between 25 psi
and 80 psi (172 kPa and 552 kPa).
Integral water tempering chamber
Governing codes may require that the
212 °F (100 °C) drain and skim/overflow
water from the humidifier be tempered
before it is discharged into the building
drain piping. The GTS humidifier has an
integral water tempering chamber that
tempers 6 gpm (22.7 L/m) of 212 °F
(100 °C) water to 140 °F (60 °C). The water
tempering sequence of operation is:
1. Hot water discharged from the humidifier
enters the water tempering chamber
from either the skim/overflow port or the
tank drain.
2. Cold water enters the water tempering
chamber through a temperature-actuated
valve to mix with the hot discharged
water.
3. Tempered water at 140 °F (60 °C)
maximum exits through the water
tempering chamber side outlet for safe
discharge into a municipal sewer system
or PVC pipe.
4. In order to minimize DI/RO water use,
disconnect factory piping to the water
tempering device and pipe directly to tap
water.
5. If planning to use heated supply water,
disconnect the water line to the water
tempering device at the fill manifold,
and reconnect it to a cold water supply.
This will ensure that the water tempering
device operates properly.
Installation