Installation checklist.
Installation
Before installing your VAPOR-LOGIC
®
3
control
system, review this checklist to ensure proper
installation of the product. Failure to follow the
recommendations listed below could result in failure
or damage to the humidifier or microprocessor.
Read this manual and information before
starting.
See wiring diagram and information located
inside the control cabinet door. Return all
information to the control cabinet after
installation.
Position the control cabinet so that it is in sight
of the humidifier tank.
Position the control cabinet so that the wire
length from the control cabinet to the
humidifier is 50 feet or less.
Connect an approved electric earth ground to
the earth ground lug in the control cabinet.
Never route the low voltage field control wires
near the line voltage section of the control
cabinet or in the same conduit as line voltage
wires.
Never use shielded cable for water level probe
wiring.
Attach the heater/machine ground lug in the
junction box, on the humidifier, to the subpanel
machine ground lug with the appropriate wire,
sized per equipment grounding section of The
National Electric Code.
Use 2-wire, 18 gauge shield plenum
nonconduit-rated cable with drain wire for all
humidity and temperature sensor wiring. (Use
Belden Company cable #88760 or equivalent;
see wiring diagram for appropriate connections.)
Never ground shield at sensor end. A shield
grounding lug is provided on the control cabinet
subpanel to ground the cable shielding.
Keypad installation precautions:
Do not locate keypad inside control cabinet.
Route modular cable within control cabinet
separated from line voltage circuits.
Verify that VAPOR-LOGIC
3
program code,
which is detailed on Pages 8 and 9 of this
manual, matches field requirements.
Follow the recommended control cabinet field
conduit knockout locations shown on the next
page as Figure 12-1.
Installation:
Installation checklist