
23
Changing control input
VAPOR-LOGIC
®
3
has the ability to accept different
types of demand signals from either an energy
management system or a humidistat. Follow these
steps when a signal change is needed:
1. Remove the old signal wires from the board
(terminals 21, 22 and 23).
2. Refer to program code nomenclature on Pages 8
and 9. Refer to: “K. Type of humidity sensing
device” to identify the new signal that is needed.
3. Enter the “Set Up” screen on the
VAPOR-LOGIC
3
keypad and scroll to the
“Configuration String” screen.
Installation:
Changing control input
Installation
Changing control input.
4. Change the last character in the configuration
string to the desired input signal type identified
from the program coded nomenclature
information on Pages 8 and 9.
5. Adjust the shunt connector J17 to the proper
signal type, if necessary:
– If the signal is current, the jumper should be
on I.
– If the signal is voltage, the jumper should be
on V.
– If the signal is resistance, the jumper should
be on R.)
6. Connect the new signal to the board.
Commentaires sur ces manuels